POLYPROPILENE, METALLIZING & EXTRUSION - NEW LINE 604

Project Desciption

Jindal Films Europe, a leading manufacturer of specialty biaxially oriented polypropylene (BOPP) films. The project consist of a increase Metallizing & Extrusion capabilities at its Brindisi site. A world-class 10.5m orientation line will be installed by 2016, increasing capacity by more than 50,000 tons per year and further improving production flexibility. The Metallizer is expected to start-up in, 2016 and will add 10,000 tons of metallization capacity.

YEAR: 2016/2017

MAIN COMPANY: JINDAL FILMS EUROPE – BRINDISI

ENGINEERING CONTRACTOR: BUILD ENGINEERING SRL

Engineering supplied

The Build is developing the following activities:
• Project Management
• Process for utilities
• Detailed engineering for utilities
• Development of civil specifications, mechanical, electrical, plant
• Work supervision.

PHOSPHATE PLANT PROJECT

Project Desciption

The Saudi Arabian Mining Company (Ma’aden) intends to develop the Umm Wu’al Phosphate Project in the Kingdom of Saudi Arabia. This Project is based on the exploitation and processing of the Umm Wu’al phosphate deposit, taking advantage of existing and future railway infrastructure, linking the phosphate deposits of Umm Wu’al in the northern region with the Industrial City of Ras Al Khair on the Arabian Gulf.

YEAR: 2015/2016

MAIN COMPANY: Saudi Arabian Mining Company MA’ADEN

ENGINEERING CONTRACTOR:JACOBS/DESMET BALLESTRA7CS IMPIANTI SPA

Engineering supplied

Build Srl operated with its long term partner CS Impianti Spa for the development of the following activities:
• Process: P & I update in accordance with the development of the model and the process of revisions, compilation of classes and attribute, the line parameters, line list extraction
• Civil: foundation engineering and concrete structures, underground networks, pavements, roads and external works, underground drainage networks, 3D models
• Structure: engineering of the steel structures, calculation, details analysis, workshops drawing, 3d models.
• Architectural: development of 3D models and architectural drawings of the various buildings, material lists, roads
• Piping: implementation of the 3D model in PDS, piping layout dwg, data sheets commented, interconnecting, supports, stress analysis.

SKIDS - EPC FOR AL DABB’IYA SURFACE FACILITIES-PHASE III

Project Desciption

ADCO is one of ADNOC Group of Companies,one of the world’s largest oil companies, and operates the Al Dabb’iya field which is located 40 km South West from the city of Abu Dhabi.

Al Dabbi’iya Phase III is part of the ADCO North East Bab (NEB) development program. The current Project’s scope of work consists in the EPC activities up to Performance Tests for the expansion of the existing facility. It will encompass the following main parts:
• Gathering crude oil system through a network of pipelines;
• Central Process Plant (CPP);
• Oil and Gas Export pipelines;

YEAR: 2016/2017

MAIN COMPANY: Abu Dhabi Company for Onshore Petroleum Operations (ADCO)

ENGINEERING CONTRACTOR: TECNIMONT/FORES ENGINEERING/PLANTEC SRL

Engineering supplied

Build Srl operated with its long term partner Plantec srl for the development of the following activities:
• Steel Structure for skid : development of model 3d, detailed drawing, calculation for n. 10 skid

MODULARIZATION - NORTH WEST UPGRADING INC

Project Desciption

NWR intends to construct and operate an Upgrader in the Industrial Heathland area of Sturgeon Country, located northeast of Edmonton, Alberta that will process and convert bitumen or heavy oil into condensate, naphta, ultra low Sulphur diesel, and low Sulphur gas and oil to be sold separately or reblendend and sold as light, sweet crude oil.

YEAR: 2011/2012

MAIN COMPANY: NWR NORTH WEST REDWATER PARTNERSHIP

ENGINEERING CONTRACTOR: ENI CANADA/SIMECO Spa

Engineering supplied

Build Srl operated with its long term partner Simeco Spa for the development of FEED, in detail:
• Modularization activities management
• Specialist Project Leader
• Engineering for above ground (data sheet commented, distribution, piping layout)
• Engineering for Underground (data sheet commented, distribution, piping layout)
• Stress analysis

INGENIERÍA BÁSICA EXTENDIDA DE LA REFINERÍA PETROBICENTENARIO

Project Desciption

Petrobicentenario (Petroleos de Venezuela 60% & ENI 40%) Refinery is a grass root refinery that will be built in the existing coastal industrial complex of Jose, in the northeast region of Venezuela. Jose is located 35 km from Barcelona, the capital of the Anzoátegui State.
The refinery will process 240.000 BPSD of Extra Heavy Oil (EHO) produced in the Orinoco Oil Belt and 134.275 BPSD of Upgraded Oil (UCO) produced in existing Petromonagas Upgrader of Jose Complex nearby this new refinery.

YEAR: 2015/2016

MAIN COMPANY: PDVSA PETROBICENTENARIO

ENGINEERING CONTRACTOR: SAIPEM/CS IMPIANTI SPA

Engineering supplied

Build Srl operated with its long term partner CS Impianti for the development of FEED, in detail:
• Specialist Project Leader
• Engineering for above ground (data sheet commented, distribution, piping layout)
• Engineering for Underground (data sheet commented, distribution, piping layout)
• Stress analysis

IMPIANTO EST UNITA’ ASSOCIATE SANNAZZARO

Project Desciption

The Project include N. 2 complete Ammonia Plants (Licensor Haldor Topsoe A/S – design capacity 2 x 2,200 t/d) based on Steam Reforming of Natural Gas consisting of the following process systems:
Steam Reforming of Natural Gas and Waste Heat Recovery; HT & LT Shift Converters; CO2 removal by MDEA; Methanation; Syngas Compression; Ammonia Synthesis Loop; Ammonia Refrigeration; Purge Gas Scrubbing & Hydrogen Recovery; Process Condensate Stripper; Deaerator & BFW pumps.

YEAR: 2010/2011

MAIN COMPANY: ENI S.P.A. – RAFFINERIA DI SANNAZZARO – FERRERA ERBOGNONE (PV)

ENGINEERING CONTRACTOR: SAIPEM/CS IMPIANTI Spa

Engineering supplied

Build Srl operated with its long term partner CS Impianti Spa for the development of the following activities (N. 11 structures n. 2 rack):
• Specialist Project Leader
• Civil: foundation engineering 3D models
• Structure: engineering of the steel structures, calculation, details analysis, workshops drawing, 3d models.

AMMONIA-UREA PLANT AND COGENERATION

Project Desciption

The Project include N. 2 complete Ammonia Plants (Licensor Haldor Topsoe A/S – design capacity 2 x 2,200 t/d) based on Steam Reforming of Natural Gas consisting of the following process systems:
Steam Reforming of Natural Gas and Waste Heat Recovery; HT & LT Shift Converters; CO2 removal by MDEA; Methanation; Syngas Compression; Ammonia Synthesis Loop; Ammonia Refrigeration; Purge Gas Scrubbing & Hydrogen Recovery; Process Condensate Stripper; Deaerator & BFW pumps.

YEAR: 2008/2009

MAIN COMPANY: QATAR FERTILISER COMPANY (QAFCO)

ENGINEERING CONTRACTOR: SAIPEM/SIMECO Spa

Engineering supplied

Build Srl operated with its long term partner Simeco Spa for the development of FEED, in detail:
• Specialist Project Leader
• Engineering for above ground (data sheet commented, distribution, piping layout)
• Engineering for Underground (data sheet commented, distribution, piping layout)
• Stress analysis

TCO FGP/WPMP PROJECT (FUTURE GROWTH PROJECT / WELLHEAD PRESSURE PROJECT)

Project Desciption

The Project consists of the fabrication and erection of 75 PAR’s (55.000 tons of rack) that shall be executed at ERSAI Caspian Yard or at Fabrication Subcontractor’s Yard.

YEAR: 2016/2017

MAIN COMPANY: TENGIZCHEVROIL (TCO)

ENGINEERING CONTRACTOR: ERSAI/CM-TS Srl

Engineering supplied

Build Srl operated with its long term partner Cm-Ts Srl for the development of 15,000 tons of rack, with the following activities:
• STRUCTURES: development of 3D models, shop drawing, assembly drawing, MTO & Weld summry List
• Erection sequences